top of page
Pioneering Meetings
Wednesday, 26 October 2016
8 Lea Rd, Rondebosch, Cape Town, 7700, South Africa
We started on the 27th by building an interlocking bridge at the hall, estimating how long we'd need it, and then moving it down to the canal and setting it up.
Then the two weeks following that we built a Monkey Bridge, using a 4-3-3-1 and a tree as the base points
We had several challenges with it and also took the cubs over it!
Gallery
bottom of page